Raised S.B. No. 242
Session Year 2026


AN ACT REQUIRING A STUDY OF THE FEASIBILITY OF REDUCING THE TIME TO SWITCH ELECTRIC SUPPLIERS.

To require the Consumer Counsel to conduct a study of the feasibility of reducing the time it takes a consumer to switch electric suppliers.


Other Bills with Similar Topics